Advertisement

Six months after clearing a property at 3rd Street and Mariposa Avenue in Koreatown, developer CGI Strategies has made it official: construction is underway for the company's latest development.

The project, known as the Mariposa, will feature 121 apartments - including 17 units of affordable housing - and 4,600 square feet of ground-floor retail space.  The seven-story brick and concrete building will offer a mix one- and two-bedroom apartments - ranging between 622 and 1,000 square feet - in addition to a rooftop pool deck, a fitness center, and a theater room.

Architect Warren Techentin designed the podium-type building.

Completion of the Mariposa is anticipated in Spring 2018.

CGI's pipeline of Koreatown developments currently consists of more than 500 residential units.

Image courtesy of CGI Strategies

From the Web

Eight Small Lot Houses Break Ground in Silver Lake

Complete is anticipated in November.
bar

Los Angeles-based developer RC Homes has broken ground on a new set of small-lot houses in Silver Lake.

Hyperion Silver Lake, named for its address at 853 Hyperion Avenue, will consist of eight-single family dwellings, each featuring three-bedroom and 3.5-bathroom floor plans.